MAROUSI PLAZA

The project concerns the fabrication and the installation of the faÁade and the mezzanines steel structures for the new Deloitteís office building. Our contract included the design, the construction the painting and the installation
of the steel structures. The total weight of the steel structures came up to three hundred and fifty tons while the required time for the completion of the project was one hundred and eighty days. The contact of all the faÁade steel structure with the concrete beams and columns of the building set up the need of a detailed surveying and designing and also of a precise construction in order to avoid the concreteís deviations and result in the desirable architectural.  architecturearchitecturearchitecture